HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS
For the week of April 19-25
NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.
Bridges & Tunnels:
Hampton Roads Bridge-Tunnel, I-64:
· Alternating, single-lane closures westbound on April 20-23 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
· Alternating, single-lane closures southbound on April 20-23 from 9 p.m. to 5 a.m.
James River Bridge, Route 17:
· Single-lane closure southbound on April 19 from 8 a.m. to 4 p.m.

I-64 Widening Project, York County:
· Single-lane closures on I-64 east and west from Route 199 Lightfoot exit (exit 234) to Route 199/Humelsine Parkway (exit 242) April 19-23, from 7 p.m. to 5 a.m.
· Traffic shift scheduled to begin overnight starting as early as April 21, on I-64 east between Colonial Parkway and Route 199/Humelsine Parkway (exit 242).
· Lane closures under flagger control on Rochambeau Drive west of Route 199/Newman Road (exit 234) on April 22, from 8 a.m. to 4 p.m.
· A consecutive, long-term lane closure under traffic signal control on Colonial Parkway at the I-64 overpass continues.
· A consecutive, long-term full ramp closure on Route 143 Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure.
I-64 Southside Widening, High Rise Bridge Expansion:
· Alternating, single-lane closures on I-64 in both directions between South Military Highway (exit 281) and Greenbrier Parkway (exit 289):
· April 20-23
· I-64 westbound from 6:30 p.m. to 5 a.m.
· I-64 eastbound from 7 p.m. to 5 a.m.
· April 24, from 8 p.m. to 8 a.m.
· April 25, from 8 p.m. to 9 a.m.
· April 26, from 8 p.m. to 5 a.m.
I-64 Express Lanes
· Full closure of I-64 Express Lanes in both directions on:
· April 20, from 9-11 a.m.
· April 20-23, from 8 p.m. to 3 a.m.

I-64/I-264 Interchange Improvements Project, Norfolk/Virginia Beach:
. Double-lane closures on I-264 east from Newtown Road (exit 15) to Witchduck Road (exit 16) on April 19-24 starting as early as 7 p.m. and continuing as late as 10 a.m.
· Single-lane closure on I-264 west from Witchduck Road (exit 16) to Newtown Road (exit 15):
· From April 17 at 7 p.m. to April 20 at 5 a.m.
· From April 24 at 7 p.m. to April 27 at 5 a.m.
· Single-lane closure on I-264 west from Witchduck Road (exit 16) to Newtown Road (exit 15) on April 20-24 from 9 a.m. to 3 p.m. and 7 p.m. to 5 a.m.
Elizabeth River Tunnels (Downtown/Midtown tunnels):
Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
HRBT Expansion Project:
For future lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

